一、Project background and requirements
Project location: Luyang District, Hefei, Anhui
Project background: Photovoltaic power generation grid-connected project equipment monitoring
In order to realize the real-time collection of meter data, power quality analysis equipment data, arc island protection equipment data, and effectively monitor electrical data, real-time monitoring is achieved. Low cost, simple wiring, and wireless transmission methods are used to realize data collection.
1、State Grid electricity meter data collection, real-time collection, and remote monitoring.
2、the online power quality detection device (Nanjing Canneng, model: NBQS-581) and the arc island protection device (Kezi Electric Power, model: KZB-300F ) requires complicated conventional wiring methods, and the site does not support the prerequisite for large-scale wiring implementation.
Power quality online monitoring device
Corresponding to the equipment that needs to be collected
二、Project technical solution
Overall implementation of technical solution architecture:
Figure 2: Overall implementation plan
For electric meters, we use our main 4G infrared meter reading product ( SC-GP-IR4G) to achieve non-immersion installation and collection
Electricity meter collection solution
For the online detection device of power quality and arc island protection device, data collection is carried out through the 485 communication port of the original equipment, and is implemented with our company's 4G wireless data acquisition terminal (SC-GP-GWRTU).
Figure 4 : Arc island protection and power quality monitoring equipment collection scheme
Power quality monitoring collection parameters
三、On-site implementation process and installation docking
3.1 Electricity meter data collection
The meter data collection connection is relatively simple. The probe is fixed, the power is collected by the collection equipment, and after the technical remote debugging protocol, the meter data can be collected in real time.
Electricity meter collection implementation diagram
3.2 Online power quality detection device and arc island protection device
Determine the 485 communication port of the device to be collected, ensure that the collector can collect data through the 485 communication interface, and then connect on-site.
On-site 485 communication wiring diagram
The communication interface line of the collection equipment is fixed, and after the collector is fixed and installed, it is powered on site. The matching suction cup antenna needs to be placed in an open position to avoid the confined environment affecting the 4G signal transmission.
On-site collector installation wiring diagram
四、Implement data collection and final presentation
Our 4G infrared meter reading products and 4G wireless data collection terminals are equipped with a dedicated data viewing cloud platform (Figure 8, Figure 9, Figure 10)
.
Electric meter data background display
Power quality monitoring background data display