TEL: Facebook/wechat/WhatsApp:+8619936624847 LINE:daqiot

Flue gas monitoring data converted to IEC104 protocol and connected to the power bureau platform - Guoneng Chifeng biomass power generation project

Aug,01,2025 << Return list

Project Requirements

Project background: The environmental protection data of Guoneng Chifeng Biomass Power Generation Company has been connected to the environmental protection data acquisition instrument and connected to the Environmental Protection Bureau platform through the HJ212 protocol.

According to policy requirements, flue gas data needs to be uploaded, forwarded and connected to the power bureau platform.

The flue gas meter uses the modbus protocol/232 interface and needs to be converted to the IEC 104 protocol and forwarded to the power bureau platform.

Project Requirements

Project background: The environmental protection data of Guoneng Chifeng Biomass Power Generation Company has been connected to the environmental protection data acquisition instrument and connected to the Environmental Protection Bureau platform through the HJ212 protocol.

According to policy requirements, flue gas data needs to be uploaded, forwarded and connected to the power bureau platform.

The flue gas meter uses the modbus protocol/232 interface and needs to be converted to the IEC 104 protocol and forwarded to the power bureau platform.

image.png 

On-site environmental protection data acquisition instrument distribution box

image.png 

Environmental protection data message screenshot

image.png 

Target message: IEC104 message effect display

Project plan

image.png 

Schematic diagram of the access plan of the power company

Project Implementation

1. The Digital IoT Company provides the protocol conversion gateway to the customer .

2. After receiving the gateway , the customer cooperates with our technicians to install the wiring and provide a collection point table . The technicians will remotely configure the protocol gateway . (See the figure below)

image.png 

Flue gas point table data unit description

image.png 

Schematic representation of smoke data points

image.png 

Point table parameter configuration

3. Switch to 104 protocol by configuring the gateway

image.png 

4. Uploaded to the power bureau platform, due to customer data confidentiality issues, use PMA protocol software simulation test, see the figure below.

image.png 

image.png 

IEC10 message data debugging process

image.png